







Rooflight Triple Glazed Self Clean
All rooflights are made to order and cannot be returned. Please ensure sizes and specifications are correct before placing your order.
Skylights Roof Lanterns specialise in supplying premium stock high quality triple glazed, self-clean, UV protected, thermal efficient skylights at low prices throughout United Kingdom. What sets us apart from our competitors is, our product comes with all the extra’s that are usually optional costed extra’s with long lead time, but we offer these features at no extra cost and no additional lead time. In addition, our frameless stepped tripled glazed skylights are designed to offer uninterrupted views of the sky whereas most competitors skylights come with bulky internal and external frames. The standard triple glazed rooflight specification has the added benefit of noise reduction. This unique cost-effective design and approach has lead Skylights Roof Lanterns to become the market leader in the industry.
Flat Skylights Roof Installation
Hassle-Free and Simple Fitting
The supplied skylight is easy for a builder to install.
Our skylights are able to be installed conveniently on insulated upstands when coupled with builder-provided building materials.
All information and diagrams relating to installation that you can see here is only for the purposes of general guidance since every project varies in construction and design depending on the drawings of the architect. Also, upstand design and dimensions can vary depending on the insulation specifications and architect’s drawings.
How Is The Opening Measured?
Before purchasing the skylight, you first need to measure the opening in which the skylight is going to be fitted. It’s vital to leave 5 mm tolerances around the entire structural opening so that the bottom pane of the skylight can effortlessly fit into the space. The opening is the hole in the roof.
As an example, if you’ve bought skylights measuring 1000 mm x 1000 mm, this represents the dimensions of the glass’s top pane that will rest on the upstand’s top. The lower glass pane is 100 mm smaller around its sides, resulting in measurements of 800 mm x 800 mm. The structural opening, therefore, must be 810 mm x 810 mm, with the upstand width of a maximum of 70 mm and a maximum height of 150 mm. A 100 mm black border and a step of 100 mm is all around the top glass pane.
Roof Preparation
The skylight will be secured to the timber upstand that is prepared by the builder or roofer during the process of constructing your flat roof.
It’s essential for your timber upstand to have a minimum protrusion of 150 mm above your roof. The pitch must be a minimum of 6°, as this is enough to enable the free flow of water downward so that water will not pool on the glass surface. The maximum pitch for the installation must be no more than 45°. For the easy clean solution to work optimally the pitch should be 10 degrees. The rooflight can be installed at lower pitches but this would mean the self-clean coating wouldn’t work as effectively and you may get water pooling on the top. We recommend pouring water over the top glass before bonding it if you want to install at a lower pitch.
Skylight Installation
The final step that you need to complete when finishing your roof before installing the skylight involves the application of the roof covering onto the side of the upstand, thus making it weatherproof.
Before the product is sealed with silicone, you can apply water to it to test whether it can flow off effectively. Should pooling occur, you may need to raise the pitch. In order for optimal function of the easy-clean solution, the roof pitch must be at least 10 degrees with adequate wind flow to all directions.
Dowsil 791 silicone must be applied in reasonable amounts to the top part of the upstand as per the datasheet provided by the silicone supplier. After this, the top skylight pane can be placed onto the upstand’s top. Pressure should be applied around this top pane to enable even spreading of the silicone so any gaps will be effectively sealed.
All of the four bottom pane sides must then be supported once it has been put into position with the timber batten with top aluminium strip section at the top bonded and fitted before the plasterboard. A suitable structural silicone must be applied between the surfaces of the aluminium trim and the glass bottom pane as per the datasheet provided by the supplier, and it must be secured firmly in place. Excess silicone should be wiped away with finishing tools and the plasterboard may be installed at this time.
Only a sealant that is compatible with setting bocks, the aluminium angle trim, the glass, and the upstand’s top must be used. Dowsil 791 weather-proofing silicone or Dowsil 895 structural sealants are the best choices. Note that some sealants require the application of primer to surfaces first.
Pitched Skylights Rooflight Installation
Please see fitting diagram below for installation on pitched roofs.
Our rooflight systems are ideal for a variety of properties, ranging from single-storey flat roof extensions to fully developed residential areas. This frameless rooflight product is manufactured to the highest specifications with self clean, triple glaze, uv protected glass. This means the rooflight supplied has exceptional thermal performance and noise reduction.
- Premium Quality
- 30 Years Warranty
- Price Beat Guarantee
- Triple Glazed
- Easy Clean Glass
- Centre U Value: 0.9 W/m²K
- Designed in UK
- Suitable for Flat and Pitched Roofs
- UV Protection
- Exceptional Thermal Performance
- Triple Glazed unit offers better sound insulation compared to double glazed
- Easy Installation Guide
- Top Pane Glass: 6mm BS EN 12150 Toughened Glass
- Spacer Type: Black Warm Edge
- Air Gap/Spacer: Warm Edge Spacer bar Argon Gas Filled Structurally Bonded
- Middle Glass Pane: 6mm BS EN 12150 Toughened Glass
- Air Gap/Spacer: Warm Edge Spacer bar Argon Gas Filled Structurally Bonded
- Bottom Glass Pane: 6mm Low EBS EN 12150 Toughened Glass
- Clear Glass
1-3 working days delivery timeframe in most areas. Deliveries to Scotland and some remote areas can take up to around 5 working days. Please not we do not deliver outside of UK mainland. Extended lead time may apply to postcodes shown: EX, TA, PL, TR, TQ, SA, SY, LL, LA, CA, PR, BB, YO, HU, LN, DL, SR, NE, KY, KA, EH, AB, IV, PH, PA, NR, ML, KW, DD, FK, DG, TS.
Third-party transport delivers to each area on specific days of the week between 7:30 am and 6 pm, Monday to Friday. Delivery is available to all postcodes accepted on the checkout page, with delivery charges calculated during the checkout process on our website.
Orders are processed Monday to Friday, 9 am to 5 pm, excluding bank holidays. Lead time is between 1-3 working days to most areas. Lead time for the postcodes below will be around 3-5 workings days.
Extended lead time may apply to postcodes shown: EX, TA, PL, TR, TQ, SA, SY, LL, LA, CA, PR, BB, YO, HU, LN, DL, SR, NE, KY, KA, EH, AB, IV, PH, PA, NR. We deliver to PO postcodes but not Isle of Wight.
Skylights Rooflight is not responsible for shipment delays due to unforeseeable circumstances or third-party transport issues. Ensure that labour is available on-site to unload your product from the third-party delivery van, as drivers are not insured to offload. The recommended lift per person is 25 kg, and products can weigh up to 200 kg, so a sufficient number of people must be present to unload.
If delivery fails because no one was on site or the driver could not reach someone, the product will be returned to the depot or our warehouse, and a re-delivery charge may be incurred.